Timelines by finish

How we build YORHUS houses

Timelines by finish level

50–60 days
Warm shell
70–80 days
White-box
≈100 days
Turnkey

The exact timeline depends on the project and is agreed before construction begins.

Stages

Construction stages

Five major phases — from site to finished house. Some work runs in parallel.

1
Preparation
Site analysis, design, estimate and contract.
2
Foundation
Site preparation, foundation construction, dimensional control.
3
Production
Panel production, timber preparation, marking and quality control.
4
Installation
Structural assembly, roof, windows and facade where included.
5
Finishing & handover
Engineering systems, finishing per package, final inspection and handover.
Real construction

What assembly looks like on site

Not only concepts and diagrams: the kit arrives on site marked by project, the team assembles the shell on the prepared foundation, and the stages are documented with photos.

YORHUS team assembling SIP panels on site
01 · SIP panel assemblyPanels arrive on site according to the project marking, so the assembly stays fast and organised.
YORHUS house during shell assembly
02 · House shellThe load-bearing structure is assembled on site, with geometry and joint checks during the work.
Real YORHUS project on its foundation
03 · Project on foundationThe foundation, structure and following works are coordinated by one responsible team.
Panel markingTeam on sitePhoto documentationJoint control
Production

From production to assembly

We cut and assemble the kit ourselves to the exact house design. Production time depends on the size and complexity of the project.

Warehouse of finished SIP panels
01 · StockCertified SIP panels in stock. Labelled per project.
SIP panel geometry control
02 · QCOSB + polystyrene + OSB. Hand-checked geometry.
SIP panel preparation — edge processing
03 · CutCut for windows, doors and joints.
Team at work in the workshop
04 · AssemblyFinal assembly before shipping to site.
Barnhouse under construction
Building now

Visit the Barnhouse site in Străisteni

See how SIP panels are assembled, what the joints look like and how the team works on a real active project.

SIP panel assemblyBarnhouse · Străisteni
Quality control

What we check

Every project passes a checklist inspection with photo documentation.

Geometry
Joints & fasteners
Airtightness
Moisture protection
Photo documentation
Installation inspection
Guarantees

Guarantees written into the contract

A guarantee is not words but contract clauses. Service life and zones of responsibility are fixed in writing.

50+ years
Expected service lifeThe expected service life of the structure exceeds 50 years with correct installation, moisture protection and proper maintenance.
10 years
On SIP panels
Warranty on the load-bearing SIP structure from our own production.
5 years
On assembly
Warranty on build quality, joints and assembly connections across the house.
Estimate the cost